| TIME |
TOPIC |
REMARK |
| 9.40 – 10.30 |
2D Design
- Wall/ Room
- Door/ Window
- Ceiling/ Ceiling block
- Lighting |
|
| 10.30 – 11.00 |
Cabinet setting
- Door Style
- Parameter Setting
- Material Setting |
|
| 11.00 – 12.15 |
Cabinet Installation (part 1)
- Modification on cabinet
- Accessories/hardware installation
- Cabinet parts installation |
|
| 1.30 – 2.00 |
Cabinet Installation (part 2)
- Panel installation
- Door style update
- Material update
- Handle modification |
|
| 2.00 – 2.30 |
Quotation |
|
| 1.30 – 2.30 |
Ceiling
- Plaster ceiling
- Dropped ceiling
- Coffered ceiling |
|
| 2.30 – 4.30 |
Output Drawing
Perspective Drawing
Radiosity
Light Adjustment
Raytrace
Save Image
|
|
| TIME |
TOPIC |
REMARK |
| 9.30 – 10.00 |
Wardrobe Body Installation
- Accessories insertion |
|
| 10.00 – 10.30 |
Top Unit |
|
| 10.30 – 12.00 |
Sliding Door Installation
- Modification on sliding door pattern
- Sliding door design
- Partition door |
|
| 1.30 – 2.00 |
Aluminum Flex Installation
- Add library
- Accessories insertion |
|
| 2.00 - 4.30 |
Exercise |
|